yd2333云顶电子游戏

CN EN
Nansha Gymnasium
Project introduction
  • Honor
    the 12th Tien-yow Jeme Civil Engineering Prize
  • Contractor
    Guangzhou Engineering Contractor Group Co., Ltd. (EPC)
The main steel structure of the project adopts a double-layer ring-shaped string dome structure with a main span of 98 meters, and the key construction technology of double-layer wheel shape beam string prestressed steel roof truss has reached the domestic advanced level.
 

XML 地图